List Of Works Executed By Us

LIST OF WORKS (PART) EXECUTED BY

THE ENGINEERING CONSULTANTS LTD.


Sl No.


Name of Contract


Name of Employee


Year of Completion  

01.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
6-storied office building, Residential Buildings, Workshop Complex, 2.34
km International Bituminous Roads including 3 RCC Box Culverts &
Accessories of BCDP at Baghabari Ghat, Pabna

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

Australian High

Commission, Dhaka.

1987

02.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
Deputy Commissioner’s Bungalow, District Judge’s Bungalow, 6-storied  D
type Quarter, 2.73 km Internal Bituminous Road including Boundary Walls
and Accessories at Jamalpur and Sherpur District Head Quarters.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

Project

Implementation

Committee, Jamalpur.

1987

03.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of  Construction of UNDP
Building at Dhanmondi ; Tennis Court including Electrification,
Remodeling of Annex Building & Ancillary works at Hotel Sheraton; Civil
& Decoration works of IBBL at Motijheel C/A, Dhaka; Sales Centre of
Islamic Foundation Bangladesh; Remodeling works of Australian Recreation
Centre at Gulshan, Dhaka under Australian High Commission, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc..

UNDP/BSL/IBBL/IFB

Australian High
Commission, Dhaka

1988

04.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of  Construction of 3
RCC Bridges (i) 95 m Long, (ii) 79 m Long, (iii) 63 m Long and 6 RCC Box
Culverts of different sizes at different locations at Ghatail & Bhuapur
at Tangail on Ghatail – Sunatia & Sunatia – Bhuapur Road.

Zilla Parishad,

Tangail.

1988

05

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
Gazetted & Non-Gazetted officer’s staff Quarters including Boundary
Walls at Nakla, Sherpur under PWD, Sherpur; Canteen, Boundary walls Lime
Terracing & Main Gate at Agrabad C/A, Chittagong; Boilder Water Tanks,
Boundary Walls & Ancilllary works of  BSAFIC, Joypurhat.

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

PWD/BHBFC/BSAFIC,
Dhaka.

1988

06

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
Siddeshwari Boys High School; Sales & Exhibition centre of the
Directorate of women affairs at Eskaton Garden, Dhaka, Upazila
Chairman;s Quarter at Sreebordi, Sherpur.

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

Siddeshwari School
Management Committee/DWA

Dhaka & Upazila
Parishad, Sreebordi, Sherpur

1989

07

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of (i)
65m Long RCC Bridge over Katakhali Khal on Sreebordi-Jhagrarchar Road,
(ii) 61m Long RCC Bridge over Garkhai Khal at langer Para on Sreebordi –
Mobarakpur Road, (iii) 57m long RCC Bridge over Sailerkhal on
Kurua-Kalibari Road and 6 RCC Box Culverts of different sizes at
different locations at Sreebordi, Sherpur

LGED,

Sherpur

1989

08

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 4 RCC
Bridges (55m, 45m, 65m & 45m Length) over Pateshwari River, Bekerhati
River, Garamara Khal, Sunatia Khal and 8 RCC Box Culverts of different
sizes at different locations at Netrokona, Sherpur and Tangail districts
financed by US AID

Directorate of Relief
& Rehabilitation, Dhaka.

1989

09.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
Storied JCO’s Quarter, Officer’s Mess including Boundary Walls and
ancillary structures such as 3.8km Internal Bituminous Road at
Momenshahi Cantonment, Mymensingh.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

MES (Army), Dhaka

1989

10.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 117
km Bituminous roads, 23 RCC Bridges (27m to 40 m length) 75 RCC Box
culverts of different sizes at different locations & accessories under
Third Road Rehabilitation & Maintenance Project at Rajshahi & greater
Khulna Division financed by ADB

LGED, Dhaka

1990

11.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of  Construction of 11
RCC Bridges (30 m to 53 m length) & 6 RCC Box Culverts of different
sizes at different locations of Rajshahi Division financed by US AID

Directorate of Relief
& Rehabilitation, Dhaka

1990

12.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
Storied S.M Barak, JCO’s Quarter and Officer’s Mess including Boundary
walls and Ancillary structures such as 4.5km Internal Bituminous Road at
Rajendrapur Cantonment Gazipur.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

MES (Army), Dhaka

1992

13.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
Storied Shopping Cum Office Complex with 8 storied pilling foundation of
M/s. Delwar & Co. at Station Road, Jamalpur.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. Delwar & Co.

Jamalpur

1993

14.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
Improvement of Shakhipur-Kachua, Kachua- Barochauna and Barochauna –
Sagardighi Roads Project about 10 km length including 2 PSC Bridges- 48
m (3 Span) & 60 m (3 Span) and 8 RCC Box Culverts of different sizes at
different locations of Shakhipur, Tangail

LGED, Tangail

1994

15.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 190 m
long (5-Span) Post tensioning PSC bridge over river Malijhee & 22 RCC
Box Culverts of different sizes at different locations on
Sherpur-Jhulgaon-Nalitabari road under Feeder Roads Improvement Project
at Sherpur financed by ADB

FRIP, RHD, Mymensingh

1994

16.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
storied Super Market with 8 storied Piling Foundation of M/s. Poddar
Bastralai at Sherpur Town, Dist. Sherpur.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/s. Poddar
Bastralai, Sherpur

1994

17.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 12
storied “Cooling Tower” including workshop complex with 2 basement level
on 15 storied piling foundation and internal Bituminous Roads of
National Highway Standard, 06km length including 06 RCC box culverts of
Polash Urea Fertilizer Factory at Ghorasal, Narsinghdhi.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

BCIC, Dhaka.

1995

18.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
storied JCO’s Quarter, Office Mess including boundary walls and
ancillary structures such as 5.3 km internal Bituminous Roads, and
Accessories at Ghatail Cantonment, Tangail.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

MES (Army), Dhaka

1996

19.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
improvement of Nagarpur-Gaihata, Gaihata-Jautpara & Jautpara-Khas
Shahjani Roads Project about 8 km length including 2 PSC Bridges- 60 m
(3-Span) & 75 m (3-Span) and 8 RCC Box Culverts of different sizes at
different locations of Nagarpur, Tangail

LGED, Tangail

1996

20.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
storied Residential Building with 8-stoied pilling foundation of M/S.
Nurjahan & Co at 125/KA, South Pirerbagh, Mirpur, Dhaka-1216.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/s. Nurjahan & Co.

Dhaka.

1997

21.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
Improvement of Rangtia – Sandhakura & Sandhakura – Baromari Roads
Project about 8 km length including 3 Pre-stressed Bridges- 48 m (3
Span), 60 m (3 Span) & 75 m (3 Span) and RCC Box Culverts of different
sizes at different locations of Jhenaigati -Nalitabari, Sherpur.

LGED, Sherpur

1997

22.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
Improvement of Sreebordi – Kakilakura & Kakilakura Bhalijuri Roads
Project. about 10 km length including 2 PSC Bridges- 48 m (3-Span) & 60
m (3-Span) and 6 RCC Box Culverts of different sizes at different
locations of Sreebordi, Sherpur

LGED,

Sherpur

1999

23.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 12
storied Bijoy Sarani Tower with 1 Basement level on 15 storied Mat
Foundation of North South Property Development Limited at 121/3
Tejkunipara, Tejgaon, Dhaka-1215.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

NSP Dev. Ltd., Dhaka

2001

24.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
Improvement of Hatikumrul Bilbashpur Road Project, Contract # 2 (Part –
B), RRMP-III, The works comprises of Repair and slope Protective works
of Road from km 11.25 to km 17.75 with Earths,. Cement Concrete, Blocks
Geotextile  Fabrics and accessories

RRMP – III, RHD,
Dhaka

2002

25.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
storied Hospital Complex with 8 storied piling foundation of M/s Sohrab
& Co. at Victoria, Road, Tangail.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/s. Sohrab & Co.,
Tangail

2003

26.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 6
storied Residential Building with Piling Foundation at Palash Bari,
Savar, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/s. Mizan & Co.

Savar

2003

27.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation and
Improvement of Charpauli- Kakua, kakua – Hugra, Hugra-Katuli & Katuli –
Kukuria Roads Project about 12 km length including 3 PSC Bridges- 60 m
(3-Span), 75 m (3-Span) & 90 m (3-Span) and 11 RCC Box Culverts of
different sizes at different locations.

LGED, Tangail

2004

28.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rehabilitation of
Dhaka Sylhet Road (RRMP-III), Contract # 2B from Jagadishpur  Junction
to Mirpur Junction in Habiganj district about 39 km length including 4
PSC Bridges (Post tensioning Pre-stressed Concrete Structure)- 60 m
(3-Span), 75 m (3-Span), 150 m (5-Span) & 160 m (5-Span) and 67 RCC Box
culverts of different sizes at different locations financed by WB under
CGC (China Geo-Engineering Corporation)

RRMP-III, RHD, Dhaka

2006

29.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
6-storied Apartment Buildings named ATM – Dokhina at Mohammadpur, ATM –
Nijhum at Shyamoli & ATM – Mehjabin at Khilgaon.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. ATM Homes Ltd.,
Dhaka.

2006

30.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
‘Metro – Splendor’ 6-storied Apartment Building at Uttara Model Town,
Uttara, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. Metro Homes
Ltd., Dhaka.

2007

31.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
6-storied Residential Building with Mat Foundation of M/s. Nizam & Co.
at  24/16, Tejmahal Road, Block-C, Mohammadpur, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/s. Nizam & Co.
Dhaka.

2008

32.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of CNG
Filling Station on Dhaka- Tangail Road at Uttar Hizaltali, Kaliakoir,
Gazipur.

M/S. Ashuka CNG &
Filling Station Ltd., Dhaka.

2008

33.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Contraction of
6-Storied Apartment Building with Piling Foundation of M/S. Mostafa
Mohsin Mantu & Co. at Plot #  32, Road # 05, Sector # 05, Uttara Model
Town, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. Mostafa Mohsin
Mantu & Co. , Dhaka

2009

 

34.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Rectofitting of
2-storied Residential Building for protection of Earth quake at Banani,
Dhaka.

M/S. Mahbubul Haque,
Banani, Dhaka.

2010

35.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
15-Storied Service Apartment Building with 2-Basement level on Mat
Foundation at Plot # 3, Road # 126, Gulshan-1, Dhaka.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. Konik & Nafi
Associates Ltd., Dhaka

2011

36.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
6-storied Residential Building at par – Dighulia, Tangail.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

M/S. Jahanara Begum &
Co.

2011

37.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of 2
nos. Semi Pacca Residential Buildings at Kagmara (west Akurtakurpara),
Tangail.

M/S. Sharif &
Associates

2011

38.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
3-storied bungalow with 6-Storied Foundation, 4-Storied Madrasha Bhaban
with 6-Storied Foundation & 2-Storied Khan Jahan Ali Jam-e-Mosque with
4-Storied Foundation at Paigramkasba, Phultala, Khulna.

 

The works comprises of Civil construction,
Plumbing & Sanitation, Water reticulation, Electrical & Mechanical
installations etc.

 M/S. Konik & Nafi
Associates Ltd., Dhaka

2011

LIST OF ON GOING WORKS OF

THE ENGINEERING CONSULTANTS LTD.


Sl No.


Name of Contract


Name of Employee


Year of Commencement

01.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of G +12
Storied Al-Shafi Hospital cum Apartment Building/Complex with 1 Basement
level at Plot # 09, Road # 06, Block # A, Sector # 10, Mirpur Housing
Estate, Dhaka.

M/S. Al-Shafi
Hospital Ltd., Dhaka

March 01, 2011

02.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
2-storied Bhadrapukur Jam-e- Mosque & 2-storied Khanjahanpur
Jam-e-Mosque both with 4-storied Foundation at Paigramkasba, Phultala,
Khulna

M/S. Konik & Nafi
Associates Ltd., Dhaka

November 04, 2011

03.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
2-storied Mohisdia Jam-e-Mosque with 4-storied Foundation at Dighulia,
Khulna.

M/S. Konik & Nafi
Associates Ltd., Dhaka

January 01, 2012

04.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of ETP
at Dhaka Paper Mills Ltd. at Kanchanpur, Narayangonj, Dhaka.

M/S. Konik & Nafi
Associates Ltd., Dhaka

February 01, 2012

05.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
6-storied Apartment Building at Magura Sadar, Magura.

M/S. Mizanur Rahman &
Co.

April 01, 2012

06.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
2-storied Manowara Kadir Jam-e-Mosque with 4-storied Foundation at
Khalshi, Bagharpara, Jessore

M/S. Konik & Nafi
Associates Ltd., Dhaka

September 01, 2012

07.

Base line Surveying, Soil Investigations,
Planning, Designing, Drawing, Programming, Scheduling, Management &
Supervision including Monitoring and Evaluation of Construction of
10-storied Market cum Apartment Building at Dulal Mundia Bazar,
Kaligonj, Jenaidah.

M/S. ShaplaNet
(Bangladesh) Ltd., Dhaka.

October 12, 2012